Revisiting the Power Co-ordination Challenges of the Original Snowy Mountains Scheme
Main Article Content
Keywords
history, telecommunications, Snowy Mountains scheme, power co-ordination
Abstract
The Snowy Mountains Scheme (1949–1972) was an Australian hydro-electricity generation triumph. However, the power co-ordination challenges were significant before the invention of fibre optic cable, as this historic paper from June 1964 attests.